EN Switched Power Distribution Unit DK 7856.530 / 540 / 550 Assembly, Installation and Operation
Installing 6 10 Switched Power Distribution Unit EN 6 Installing Danger! Only trained specialists may perform the assembly and installation.
Operations 7 Switched Power Distribution Unit 11 EN 7 Operations 7.1 Interfaces The Switched PDU has two interfaces: the HTML interface accessed
Operations 7 12 Switched Power Distribution Unit EN 7.2 HTML Interface The HTML interface is constructed of three major components: 1. System L
Operations 7 Switched Power Distribution Unit 13 EN 7.2.1 Logging In Logging in through HTML requires directing the HTML client to the configured I
Operations 7 14 Switched Power Distribution Unit EN 7.2.3 Environmental Monitoring Sensors The Sensors page displays: • Temperature/humidity s
Operations 7 Switched Power Distribution Unit 15 EN Setting the system 3-phase load out-of-bound threshold: This setting to use for devices with 3-p
Operations 7 16 Switched Power Distribution Unit EN Enabling or disabling Telnet or SSH support: Select Enabled or Disabled from the appropriate
Operations 7 Switched Power Distribution Unit 17 EN • Optional –Both non-secure (HTTP) and SSL encrypted connections (HTTPS) are allowed access. •
Operations 7 18 Switched Power Distribution Unit EN To add a new UPS: Select the UPS manufacturer type from the Type drop-down list, type an IP a
Operations 7 Switched Power Distribution Unit 19 EN Adding and Deleting outlets from a group: Press the Edit link in the Action column for the assoc
2 Switched Power Distribution Unit Microsoft Windows is a registered trademark of Microsoft Corporatio
Operations 7 20 Switched Power Distribution Unit EN FTP The FTP configuration page is used for setup and maintenance of all settings required to
Operations 7 Switched Power Distribution Unit 21 EN Enabling or disabling SNMP support: Select Enabled or Disabled from the drop-down menu and press
Operations 7 22 Switched Power Distribution Unit EN Setting the search bind password for Distin-guished Name (DN): Enter the Search Bind Password
Operations 7 Switched Power Distribution Unit 23 EN Setting the TACACS+ server address: Enter the IP address or hostname in the Primary and/or Secon
Operations 7 24 Switched Power Distribution Unit EN Note! A restart of the PDU is required after activating new special features. 7.2.5 Tools
Operations 7 Switched Power Distribution Unit 25 EN When you enter a valid username and password, the command prompt (Switched PDU:) appears. If a l
Operations 7 26 Switched Power Distribution Unit EN Administrative Command Summary Add Grouptouser Grants a user access to one or more groups A
Operations 7 Switched Power Distribution Unit 27 EN Set System Area Specifies to total square feet for the system Set System Balance Specifies the
Operations 7 28 Switched Power Distribution Unit EN To display the names of commands that you may execute: At the command prompt, press Enter. A
Operations 7 Switched Power Distribution Unit 29 EN To display on/off status of one or more outlets: At the Switched PDU: prompt, type status, fol-l
Table of Contents 1 Switched Power Distribution Unit 3EN 1 Table of Contents 1 Table of Contents ...3 2 Documentation
Operations 7 30 Switched Power Distribution Unit EN Displaying accessible serial ports: The List Ports command displays accessible se-rial ports
Operations 7 Switched Power Distribution Unit 31 EN Ending a session: The Quit or Logout commands ends a session. A session ends automatically when
Operations 7 32 Switched Power Distribution Unit EN At the Verify Password: prompt, retype the new password and press Enter. Example The follo
Operations 7 Switched Power Distribution Unit 33 EN Examples The following commands grant the user JaneDoe access to outlets A1 and Webserver_1: Sw
Operations 7 34 Switched Power Distribution Unit EN Outlet Administration Setting the sequencing interval: The Set Outlet SeqInterval commands se
Operations 7 Switched Power Distribution Unit 35 EN Example The following command displays all outlet infor-mation: Switched PDU: show outlets<E
Operations 7 36 Switched Power Distribution Unit EN Tower Administration Creating a descriptive tower name: The Set Tower Name command assigns a
Operations 7 Switched Power Distribution Unit 37 EN Example Switched PDU: show towers<Enter> Tower ID: .A Name:
Operations 7 38 Switched Power Distribution Unit EN To create an Environmental Monitor name: At the Switched PDU: prompt, type set envmon name fo
Operations 7 Switched Power Distribution Unit 39 EN To set the serial port timeout value: At the Switched PDU: prompt, type set port timeout, follow
Documentation Notes 2 4 Switched Power Distribution Unit EN 2 Documentation Notes The audience for this guide is the technical spe-cialist fami
Operations 7 40 Switched Power Distribution Unit EN Setting the system input power factor: The Set System PF command is used to set the input pow
Operations 7 Switched Power Distribution Unit 41 EN To enable or disable strong passwords: At the Switched PDU: prompt, type set option strong passw
Operations 7 42 Switched Power Distribution Unit EN Setting the IP address: The Set Ipaddress command sets the TCP/IP address of the network inte
Operations 7 Switched Power Distribution Unit 43 EN HTTP Administration Note! A restart is required after setting or changing ANY Telnet/Web confi
Operations 7 44 Switched Power Distribution Unit EN Examples The following command sets the FTP host IP address to 12.34.56.99: Switched PDU: se
Operations 7 Switched Power Distribution Unit 45 EN Example The following command sets the automatic up-date day to Sunday: Switched PDU: set ftp a
Operations 7 46 Switched Power Distribution Unit EN To set the local GMT offset: At the Switched PDU: prompt, type set sntp gmtoffset, followed
Operations 7 Switched Power Distribution Unit 47 EN Example The following command changes UPS type for the record at index number 2 to ‘MGE’: Switc
Operations 7 48 Switched Power Distribution Unit EN Enabling/disabling UPS voltage polling: With a UPS record configured, the PDU by default enab
Advanced Operations 8 Switched Power Distribution Unit 49 EN 8 Advanced Operations 8.1 SSL Secure Socket Layers (SSL) version 3 enables secure H
Safety Instructions 3 Switched Power Distribution Unit 5EN 3.1 Safety Precautions This section contains important safety and regulatory informat
Advanced Operations 8 50 Switched Power Distribution Unit EN SSH Command Summary Command Description Set SSH Enables/disables SSH support Set
Advanced Operations 8 Switched Power Distribution Unit 51 EN SNMP Command Summary Command Description Set SNMP Enables or disables SNMP sup-port S
Advanced Operations 8 52 Switched Power Distribution Unit EN To set the Getcomm community string: At the Switched PDU: prompt, type set snmp getc
Advanced Operations 8 Switched Power Distribution Unit 53 EN All traps include the Location of the PDU as defined with the Set Location command. S
Advanced Operations 8 54 Switched Power Distribution Unit EN Set Trap Infeed HighThresh Sets the Infeed Load trap high limit Set Trap Outlet Cha
Advanced Operations 8 Switched Power Distribution Unit 55 EN Enabling or Disabling a Status trap: The Set Trap … Status command is used to en-able o
Advanced Operations 8 56 Switched Power Distribution Unit EN Displaying trap configuration information: The Show Traps command displays informati
Advanced Operations 8 Switched Power Distribution Unit 57 EN LDAP Command Summary Command Description Add GrouptoLDAP Grants an LDAP group ac-cess
Advanced Operations 8 58 Switched Power Distribution Unit EN To set the LDAP host address: At the Switched PDU: prompt, type set ldap, followed b
Advanced Operations 8 Switched Power Distribution Unit 59 EN Search Bind DN. Maximum password size is 20 characters. To set the Bind Password DN:
Safety Instructions 3 6 Switched Power Distribution Unit EN 3.2 Life-Support Policy As a general policy, Rittal does not recommend the use of a
Advanced Operations 8 60 Switched Power Distribution Unit EN Note! With the Remote Only method, if au-thentication fails due to a communica-tion
Advanced Operations 8 Switched Power Distribution Unit 61 EN Example The following command verifies the DNS configu-ration: Switched PDU: ping rit
Advanced Operations 8 62 Switched Power Distribution Unit EN Example The following command displays all LDAP groups with their access privilege l
Advanced Operations 8 Switched Power Distribution Unit 63 EN Displaying LDAP Group access: The List LDAPGroup command displays all ac-cess rights fo
Advanced Operations 8 64 Switched Power Distribution Unit EN 8.4.2 LDAP Technical Specifications LDAP Authentication Process Simple Bi
Advanced Operations 8 Switched Power Distribution Unit 65 EN 8.4.3 LDAPS Client Specifications Secure Sockets Layer (SSL) version 3 Transport Layer
Advanced Operations 8 66 Switched Power Distribution Unit EN To enable or disable TACACS+ support: At the Switched PDU: prompt, type set tacacs,
Advanced Operations 8 Switched Power Distribution Unit 67 EN Note! Rittal recommends NOT setting the au-thentication order to Remote Only until the
Advanced Operations 8 68 Switched Power Distribution Unit EN all outlets, you must use multiple Add OutletTo-TACACS commands. To grant outlet a
Advanced Operations 8 Switched Power Distribution Unit 69 EN Example The following command displays information about the TACACS+ account 1: Switche
Product Introduction 4 Switched Power Distribution Unit 7EN 4 Product Introduction The Switched Power Distributing Unit (Switched PDU) is a compac
Advanced Operations 8 70 Switched Power Distribution Unit EN Syslog The PDU’s Syslog support is RFC3164-compliant and enables off-PDU viewing and
Advanced Operations 8 Switched Power Distribution Unit 71 EN Setting the SMTP server address: The Set Email Host command sets the IP address or host
Advanced Operations 8 72 Switched Power Distribution Unit EN Displaying Email configuration information: The Show Email command displays Email co
Appendices 9 Switched Power Distribution Unit 73 EN Upload/Download Process GETting a configuration file (Download): 1. Open the FTP client. In a
Technical Specifications 10 74 Switched Power Distribution Unit EN To reset to factory defaults, except network settings From the HTML interface
Technical Specifications 10 Switched Power Distribution Unit 75 EN 10.2 Data Connections RS-232 port Switched PDUs are equipped standard with an RJ
Technical Specifications 10 76 Switched Power Distribution Unit EN 10.4 Regulatory Compliance Product Safety Units have been safety tested and c
Maintenance and Cleaning 11 Switched Power Distribution Unit 77 EN 11 Maintenance and Cleaning The Rittal Switched Power Distribution Unit is a ma
Product Introduction 4 8 Switched Power Distribution Unit EN 4.2 Power Supply The Switched PDU is powered with the included Connection Plug. Th
Mounting 5 Switched Power Distribution Unit 9EN 5 Mounting The included installation set allows the mounting of the unit on the cabinet frame and